Background
DuPont Australia required a major refurbishment for their facility in South Windsor. The lab had been operational and untouched for 40 years and needed a full upgrade with a goal to increase the functionality of the labs. Knowing that a full upgrade was inevitable, the project budget was closely managed during the Concept Design phase and throughout.